After a permit is issued, construction can begin. However, during the course of construction, inspections by the city must be conducted. To find inspection results, go to eTRAKiT.

Building Inspections Requirements

  • The city-approved site-related plan, building plans and shop drawings must be on the jobsite and accessible to the inspector. 
  • Permission to enter a yard must be posted on the front door, if necessary; the gate must be propped open; and no pets can be in the yard at the time of inspection.
  • Ladders, scaffolds and other equipment necessary to access construction must be provided to the inspector.
  • Electrical equipment must be open for inspections related to solar installations.
  • Learn about basic construction rules in the city.
  • Before you dig, you call Colorado 811 to mark underground utilities or submit a request online

Colorado 811 Logo

Scheduling a Building Inspection

  • It is the responsibility of the permit holder or contractor to notify the city when stages of construction are reached that require an inspection.
  • The deadline to schedule building-related inspections is 4 p.m. the business day prior to the day of the desired inspection date.
  • Schedule an inspection on eTRAKiT.

Other Inspections and Programs

Other Inspection Agencies 

Step 4) Occupancy & Maintenance

Step 2) Permit Application,
Contractor Licensing & Plan Review

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer